400.14 is one of those great practical rules that doesn't seem to exist in the CEC. We design and install cabling on large mobile machines with energy chains or flexible points, and you often have to mount the JB that the flexible cables enter a few meters from the end of the chain (the JB has flexible cables going in, and TECK cables going out).